A bottleneck the team found, and how to clear it

While running the three agreed packs in Q2, the skills team observed mobilisation delays associated with site-specific RAMS. This assessment separates that observation from illustrative planning costs and proposed draft-preparation targets. It proposes a fourth pack modelled on RAMS Factory and a four-week pilot for the COO to consider.

Client
Greystone FM Group
Prepared by
S. Okoro, Skills Lead
Trigger
Q2 skills-team observation
Decision by
End August 2026
Reference
BTO-GFM-NUC-001
Status
Decision required

Illustrative example: fictional project and parties.

4.2dAverage mobilisation delay
74%Work packages affected in Q2
£96kIllustrative annual cost assumption
−50%Proposed cut, pilot basis pending
BuiltAI Intelligence Ltd · built-ai.ioBTO-GFM-NUC-001 · 24 July 2026
01Opportunity

The bottleneck the team observed

Across 14 active contracts, 23 of 31 new Q2 work packages were delayed by 3 to 6 days during site-specific RAMS preparation. Previous-job templates had little site adaptation; supervisors raised late corrections, and health-and-safety review added 2 to 3 days before mobilisation.

Average delayPer new work package4.2d
Work packages affected23 of 31 in Q274%
Annual cost assumptionIllustrative preliminaries estimate£96k
StepCurrent practiceIssue
Template selectionA RAMS is copied from a previous jobRarely matches the new site or scope
AdaptationSupervisor edits by hand for site conditionsInconsistent depth, hazards missed
H&S reviewHSQE lead reviews, average 2.1 roundsLate corrections delay mobilisation
Approval and issueContract manager signs off, issued as PDFSign-off delays, weak version control
02Proposal

A fourth pack of RAMS skills

Propose a fourth pack modelled on RAMS Factory. Supervisors would prepare site-specific drafts for competent HSQE review and proposed approval, one pack per run. Confirm the relationship with current contract-manager sign-off and issue before the pilot.

Output preparedWhat it replaces
Site-specific method statement with task sequence, hazards and controlsTemplates copied from previous jobs
Task, hazard and control matrixGeneric hazard lists
COSHH index with exposure limits and PPEMissing or incomplete COSHH
Site-specific permit checklistGeneric permit references
PPE and equipment register, plus briefing and sign-off recordStandard lists and ad-hoc sign-off sheets
Confirm review and authorisation

Proposed HSQE approval does not replace contract-manager sign-off. Agree their relationship before the pilot. Drafts need competent human review; fewer correction rounds are a target, not a confirmed outcome.

03Impact & pilot

Estimated impact and how it would be tested

Observed mobilisation delay (4.2 days) and the two-day review-ready draft target have different endpoints: −52% needs a like-for-like pilot baseline. Costs are illustrative planning assumptions without an annual volume or rate basis. Define measures in Week 1 and test them over four weeks.

MeasureCurrentWith RAMS skillsChange
Mobilisation delay / draft target4.2 days2 days or less−52%
H&S review rounds2.1 average0.8 or less−62%
HSQE review time per RAMSabout 90 minabout 30 min−67%
Work packages affected74%20% or less−54pp
Illustrative annual cost assumptions£96,000£48,000−£48k
Pilot weekFocus
Week 1, setupSelect the contract, collect six months of data, set the baseline and inputs
Week 2, first outputsPrepare 3 to 4 RAMS for competent HSQE review, with agreed approval and issue roles
Week 3, iterateFold HSQE corrections into the skills, prepare the next batch, measure the fall in rounds
Week 4, reviewCompare against baseline, present to the COO and HSQE, issue the go or no-go recommendation

Proposed criteria: a review-ready draft in 2 days or less, one review round or fewer on average, HSQE first-pass approval of 80% or better, a site-team survey score of 7 out of 10 or better, and zero safety compromises. Agree endpoints, assessment bases and approval roles before testing; these are targets, not certified outcomes.

04Recommendation

The commercial basis, and the decision

Quote pilot skills under a Statement of Work before testing; quote any full catalogue build-out separately on approval after success. The £48,000 difference between the £96,000 and £48,000 annual planning assumptions is not a verified saving. Volume, rates, endpoints and build costs are not supplied; net benefit is not established.

Recommendation to the COO

Consider a four-week Meridian NHS Trust pilot in September 2026, after quote acceptance and agreement of HSQE/contract-manager approval and issue roles. If the criteria are met, consider a fourth pack from October 2026, with full build-out quoted separately on approval.

Reference BTO-GFM-NUC-001Decision COO approval by end August 2026Prepared 24 July 2026