STAGE 01 · Front Desk™ · tender intake, triage and bid decision

Where every tender checks in

Front Desk is the first stage. Before a single priced hour is committed, it captures the project, the client, the contract and the deadline, then runs an evidence-based bid decision. The tender that checks in here is B99 Malthouse Block, a boiler-house replacement put out by Grimshaw & Bolt Ltd. Everything downstream reads from what is logged at this desk.

Tender from
Grimshaw & Bolt Ltd · Principal Contractor
Reference
ITT KW-2026-4471
Intake date
27 April 2026
Submission due
17 May 2026, 12:00
Lead estimator
Iola Rees-Brown
Decision
Bid

Illustrative example: fictional project and parties.

24 / 30Bid score, decision to bid
8Trade packages in scope
£481,954Value, confirmed at Cost Stack
17 MaySubmission deadline, 12:00
BuiltAI Intelligence Ltd · built-ai.ioB99-FD-01 · Stage 01
01Intake

The tender that checked in

Grimshaw & Bolt Ltd, acting as Principal Contractor under CDM 2015 on behalf of Kettlewick Estates, issued ITT KW-2026-4471 for the full replacement of the end-of-life heat source at the B99 Malthouse Block boiler house, Kettlewick College, Somerset. BuiltAI is invited as the mechanical, electrical, public-health and controls sub-contractor, designer for the Contractor's Design Portion only, under a JCT Intermediate 2016 sub-contract. The site is a Grade II* listed, live and occupied Defence estate, so heat continuity to the block must hold throughout the works.

Captured at intakeRecorded value
ProjectB99 Malthouse Block boiler-house replacement
SiteKettlewick College, Somerset, BA22 9KW
EmployerKettlewick Estates, via Grimshaw & Bolt as PC
Contract formJCT Intermediate 2016 with Contractor's Design Portion
BuiltAI roleMEP, public-health and controls sub-contractor
Estimated value£400k to £500k, confirmed at Cost Stack as £481,954.33
Why it comes first

A tender that is priced before it is understood is priced twice. Front Desk fixes the facts, the parties and the constraints on day one, so the eight trade packages that follow are built on a single agreed brief rather than five people's separate assumptions.

02The clock

The bid clock starts here

The ITT landed on 27 April 2026 with a fixed submission deadline of 17 May 2026 at 12:00. Front Desk sets an internal QA target ahead of that, so the Last Look gate closes with a buffer rather than against the wire. The countdown captured here drives every downstream Bidroom stage, from requirement extraction to the final reconciliation.

Received, ITT KW-2026-447127 Apr
Internal Last Look QA target15 May
Submission deadline, to Grimshaw & Bolt17 May

Mandatory documents named in the ITT: tender letter, priced Bill of Quantities as a native workbook, programme, a representative RAMS sample and current insurance certificates. Submission is a single PDF plus the BoQ workbook, to the Grimshaw & Bolt bid office.

03Decision

Bid or no-bid, scored not guessed

Six criteria scored 1 to 5, where 5 is strongest. Above 18 of 30 is an automatic bid; 12 to 18 escalates to Director review; below 12 is an automatic no-bid.

CriterionAssessmentScore
Strategic fitFirst Defence-estate tender, aligned to the growth plan5 / 5
Relationship valueDoor-opener for further Grimshaw & Bolt and Defence work5 / 5
Capacity to deliverPM and Site Supervisor available across the summer window4 / 5
Profit potentialSpecialist cascade, healthy margin profile4 / 5
Win probabilityFirst tender with the PC, direct relationship, moderate3 / 5
Risk profileLive site, heritage and asbestos, manageable not low3 / 5
Total, decision to bid24 / 30
Decision and rationale

Strategic fit and relationship value carry the score clear of the automatic-bid threshold. Win probability and risk are flagged as moderate, so Director sign-off is recorded against the capacity commitment. The conflict check is clean: no current BuiltAI engagement with Kettlewick Estates, Grimshaw & Bolt or the named designer that would create a conflict.

04Hand-off

Team named, clock running, over to Roll Call

With the decision recorded, the bid team is named and notified so ownership is unambiguous from the first working day. The Bid Director signs off the win strategy, the Bid PM leads the client interface and the query log, the Technical Lead owns the CDP design, and the Commercial Manager owns pricing and terms. Twelve early clarifications spotted during pack review are flagged for the Question Time register, and the tender pack is indexed across its source documents ready for extraction.

RoleOwns
Bid DirectorDecision sign-off, win strategy, final approval
Bid PMProduction, PC interface, query lead
Technical LeadCDP design, scope structure, design queries
Commercial ManagerCost Stack, BoQ, commercial terms, validity
QA LeadLast Look gate before submission
Reference B99-FD-01Decision Bid at 24 / 30Next Roll Call, Stage 02