STAGE 03 · Question Time™ · clarifications and RFI register

Nothing assumed silently

Question Time runs the live query register from the moment Roll Call surfaces an open clause through to submission. Every unclear, conflicting or missing point is raised, tracked and either closed with a Grimshaw & Bolt response or formally parked as a recorded commercial assumption. No question is left open when the pack goes out.

Tender source
Grimshaw & Bolt Ltd ITT
Reference
ITT KW-2026-4471
Opened
30 April 2026
Closed for review
14 May 2026
Owners
Bid PM & Commercial Manager
Status
0 open at submission

Illustrative example: fictional project and parties.

14Queries raised in the window
11Closed with a PC response
3Parked as commercial assumptions
0Open at submission
BuiltAI Intelligence Ltd · built-ai.ioB99-QT-03 · Stage 03
01Register

Fourteen queries across the bid window

Seven queries carry forward from Roll Call and seven more emerge during the scope deep-dive and pricing, for fourteen in total. Eleven close with a written response from Grimshaw & Bolt. The remaining three cannot be settled at tender stage, so they are parked as explicit commercial assumptions and carried into the tender letter rather than buried in the price. None is left open at the submission gate.

Closed with a Grimshaw & Bolt response11 of 14
Parked as a recorded assumption3 of 14
Open at submission0 of 14
Parked is not the same as open

A parked query is one the client cannot answer at tender stage. Rather than guess, BuiltAI records the working assumption, prices to it, and reserves the position in writing. The three parked here are all commercial, and each is reflected in the tender letter's assumptions schedule.

02Closed

The material questions, answered

Each closed query fixes a fact the pricing or programme depends on. The response and its landing point in the outgoing pack are recorded against every one.

RefQueryOutcome recorded
RFI-03LV sub-main spare way and fault levelSpare 125 A way confirmed, 16 kA fault level
RFI-04BMS and controls, price basisPrime Cost Sum of £18,000, specialist appointed by the PC
RFI-05Incoming gas supply pressure21.4 mbar verified at 450 kW demand, no upgrade
RFI-06Listed Building Consent statusConsent already in place, held by the Employer
RFI-07SOCOTEC appendices C and DIssued by the PC, ACM scope unchanged
RFI-08Existing fire-alarm loop capacitySpare loop capacity confirmed, interface via maintainer
RFI-10Insurance levels requiredCAR at £5m accepted, standard cover confirmed
RFI-14F10 filing status under CDM 2015Filed by the PC, BuiltAI not the duty-holder

RFI-01 (IDEAL price validity), RFI-02 (blackout dates) and RFI-09 (witness commissioning attendees) close on the same basis and complete the eleven closed queries.

03Parked

Three parked as recorded assumptions

Three commercial points cannot be closed at tender stage. Each is priced to a stated working assumption and reserved in the tender letter, so the position is transparent to Grimshaw & Bolt and defensible at contract negotiation.

RFI-11 · parkedPerformance bond and parent company guarantee. Assumption: no bond below £500k, PCG at 10% of the contract sum to PC plus 12 months.
RFI-12 · parkedLiquidated damages rate. The per-day figure is to be agreed pre-contract; BuiltAI prices to a stated working assumption and reserves the right to revisit.
RFI-13 · parkedMaterial price escalation beyond tender validity. Any OEM-driven increase after the quoted window is recoverable through Provisional Sum I7.1.

Each parked assumption is scored by how confident BuiltAI is in the working position and by the impact on the £481,954.33 contract sum if it turns out wrong. All three are commercial, so none disturbs the priced scope.

RefWorking assumption priced toConfidenceImpact if wrong
RFI-11No bond below £500k, PCG at 10% of the contract sum to the PC plus 12 monthsMedium1 to 5%
RFI-12Liquidated damages at a stated working rate, revisited pre-contractLow1 to 5%
RFI-13OEM escalation beyond validity recovered through Provisional Sum I7.1MediumUnder 1%
04Hand-off

Priced-relevant answers, over to Cost Stack

The answered queries give Cost Stack the £18,000 BMS Prime Cost Sum, confirmed gas-supply basis and recorded insurance levels. RFI-11 and RFI-13 remain parked working assumptions: bond/PCG terms and the OEM escalation route still await commercial agreement. Pricing carries those reservations alongside RFI-12; closing the register does not settle the contract terms.

Into the price

RFI-04 sets the £18,000 BMS Prime Cost Sum inside Section F. RFI-05 removes a feared gas-supply cost. RFI-13 proposes recovery through Provisional Sum I7.1 as a reserved working position, not an agreed entitlement. Cost Stack retains that distinction.

Reference B99-QT-03Register 14 raised, 0 openNext Cost Stack, Stage 04