Reactive call log · Month 18

Every reactive call, in one register

The complete register of every reactive call received this month - ticket, site, fault, priority, response and fix times, engineer, and SLA outcome. The monthly log submitted to the contract manager, and the source from which the SLA and weekly performance reports are drawn.

Client
Aldgate Borough Council · 42 buildings
Contract
Term maintenance · reactive and planned
Reference
ALD-RCL-M18
Period
1 to 31 May 2026 · Month 18
Prepared by
Sentinel FM Ltd · via BuiltAI
Submitted
2 June 2026 · to the contract manager

Illustrative example: fictional project and parties.

180Reactive calls this month
175SLA met · 5 breaches
8P1 emergencies, all responded
42Sites across the contract
BuiltAI Intelligence Ltd · built-ai.ioALD-RCL-M18 · Month 18
01Register

The May call register - 180 reactive calls

Every reactive call received during May 2026 across 42 Aldgate Borough Council sites, sorted by date, with priority and the SLA outcome per ticket. This is the primary data source for the monthly contract review meeting; the full CSV export is available on request. Illustrative calculation: 175 recorded SLA-met calls ÷ 180 calls × 100 = 97.2%, rounded to one decimal place, or 2.2 percentage points above the 95.0% example target. The five recorded breaches include the disputed Parkside ticket; no outcome has been changed.

TicketDateSiteFaultPriRespFixEngineerSLA
TKT-2026-038011 MayBorough HallFire alarm panel fault, zone 2 offlineP138m2h10mR. HussainMet
TKT-2026-038021 MayCivic OfficesGents WC blocked, ground floorP36h6h40mK. PryceMet
TKT-2026-038031 MayRiverside LeisurePool changing room, broken locker handleP426h3dD. OkonkwoMet
TKT-2026-038052 MayWestfield CCExternal security light, lamp column failedP436h36hS. AhmedMet
TKT-2026-038125 MayRiverside LeisurePool pump, unusual noise and reduced flowP22h14m4h30mM. ChenMet
TKT-2026-038218 MayCivic OfficesPassenger lift stuck between floorsP24h22m5h10mR. HussainBreach
TKT-2026-038299 MayParkside LibraryBoiler failure, no heating or hot waterP24h45m6h20mD. OkonkwoDefending
34 further tickets, 10 to 12 May
TKT-2026-0384713 MayAldgate LibraryRoof leak, active ingress at section NEP21h24m6h36mD. OkonkwoMet
138 further tickets, 14 to 31 May
Total, 180 reactive callsSLA met: 175Breaches: 5
02Priority

How the month broke down by priority

P1 · Emergency4.4% of calls8
P2 · Urgent18.9% of calls34
P3 · Routine53.3% of calls96
P4 · Planned23.3% of calls42

Routine (P3) work is the bulk of the month at 96 calls. All 8 P1 emergencies were responded to within the one-hour target. The five SLA breaches were two P2 response misses and three P3 misses, across the response and the fix clocks; four are accepted, and the fifth, a P2 response miss at Parkside Library (TKT-2026-03829), is under defence on a keyholder-access basis. The Parkside response of 4h45m and fix of 6h20m are retained as recorded. Their clock basis is unresolved against the Defence Pack timeline and must be reconciled before a compliance or deduction conclusion.

03Sites

The busiest sites this month

SiteCallsP1P2P3P4Trend vs Apr
Riverside Leisure Centre2836145Up 8
Civic Offices2215124Down 2
Aldgate Central Library1804104Up 3
Borough Hall161384Same
Westfield Community Centre140374Down 1
37 other sites823134521
Total1808349642
Riverside Leisure Centre, watch

Up 8 calls on April (28 total, the highest of 42 sites). The root cause is ageing mechanical plant: 3 of the P1 calls were pool-related, at the pump motor, the filtration backwash valve and the boiler ignition. Reactive spend at this site is now the highest across the contract.

Recommended next step

Commission a planned asset condition survey of the Riverside mechanical plant room before the next pool season, covering the pumps, filtration and boiler plant. Escalated to the account manager for the June contract review, with a view to moving this site from reactive repair to a planned replacement programme.

Reference ALD-RCL-M18Period 1 to 31 May 2026Submitted 2 June 2026

Worked example · Aldgate Borough Council · 42 buildings · 180 calls/mo · TKT-2026-03847 threaded · May 2026 (Month 18) · SLA 97.2% (illustrative 175/180) · Deduction exposure £800 · £250 disputed

Figures, names and dates in this example are fictional and show the format. Live engagement docs are source-grounded against the customer’s own data inside The Plant Room™.