Dispatch Desk · PPM Completion Tracker (PPM) · Worked example Aldgate Borough Council · 42 buildings · 180 calls/mo · TKT-2026-03847 threaded · May 2026 (Month 18) · SLA 96.7% · DDP defended £800
← Dispatch Desk
Pack 06 / 09 · The Dispatch Desk™
THE DISPATCH DESK™ · CLIENT DELIVERABLE

PPM Completion Tracker

Planned preventive maintenance completion rates by asset category and site. Statutory compliance status, overdue tasks, and catch-up schedule.

CLIENT
Aldgate Borough Council · 42 buildings
REFERENCE
ALD-PPM-M18
PREPARED BY
Sentinel FM Ltd (via Built AI)
PERIOD
May 2026 · Month 18
PPM COMPLETION — MAY 2026

103 of 108 Planned Tasks — 95.4%

Planned preventive maintenance completion rates across all 42 sites. Statutory tasks (fire, emergency lighting, legionella) tracked separately with 100% compliance required.

Asset CategoryPlannedDoneOverdue%Statutory
Fire alarm testing (weekly)42420100%Statutory
Emergency lighting (monthly)14140100%Statutory
Legionella flushing (weekly)18180100%Statutory
HVAC filter changes87187.5%Non-stat
Gutter clearance64266.7%Non-stat
General building inspections12120100%Non-stat
Electrical PAT testing86275.0%Best practice
TOTAL108103595.4%
100%
STATUTORY COMPLIANCE
95.4%
OVERALL COMPLETION
5
OVERDUE TASKS
w/c 2 Jun
CATCH-UP TARGET
Statutory compliance: 100% — all 74 statutory tasks (fire alarm, emergency lighting, legionella) completed on time. Zero statutory failures for 18 consecutive months since contract start.
5 overdue tasks (non-statutory): 1× HVAC filter (Riverside Leisure — access denied due to pool maintenance shutdown, rescheduled), 2× gutter clearance (weather delay — high winds prevented safe access), 2× PAT testing (engineer sickness, backlog carried). All 5 rescheduled for w/c 2 June with confirmed engineer allocation.

Ref: ALD-PPM-M18 · Period: May 2026

built-ai.io · The Dispatch Desk™ · PPM · PPM Completion Tracker © 2026 Built AI Ltd