| Rev | Date | Description | Prepared | Reviewed | Status |
|---|---|---|---|---|---|
| Rev 0 | 15 May 2026 | Draft for internal review — 9 of 11 packages complete | A. Pereira | D. Marchetti | Internal Draft |
| Rev 1 | 22 May 2026 | Issued for client review — all 11 packages, 148 clauses | A. Pereira | D. Marchetti | For Review |
Showing 4 of 12 clauses. Full section includes: M&E secondary strip-out (A1.04), tea point removal (A1.05), door & frame removal (A1.06), protection to retained fabric (A1.08), waste segregation & disposal (A1.09), sequencing protocol L6→L5→L4 (A1.10), completion handover per floor (A1.11), photographic record requirement (A1.12).
Showing 5 of 22 clauses. Full section includes: partition types schedule (A2.02–A2.05), glazed door sets (A2.07), general-area doors (A2.09–A2.11), ironmongery schedule (A2.13), fire-stopping at partitions (A2.14), junction details (A2.15–A2.17), services coordination zones (A2.19–A2.20), snagging & sign-off protocol (A2.21–A2.22).
Showing 3 of 18 clauses. Full section includes: full-height storage walls (A4.02–A4.03), joinery door integration (A4.05), shadow-gap junction details (A4.06–A4.08), tea point bin pull details (A4.10), site survey requirements (A4.11), shop drawing protocol (A4.12), factory pre-fit attendance (A4.13), sample & mock-up requirements (A4.14), delivery & install sequencing (A4.15), protection during following trades (A4.16), snagging protocol (A4.17), warranty & maintenance (A4.18).
Showing 3 of 19 clauses. Full section includes: ductwork modifications (M1.02–M1.05), condensate routing (M1.07–M1.08), pipe insulation (M1.09), valve schedule (M1.10–M1.11), commissioning requirements (M1.13–M1.15), balancing (M1.16), O&M documentation (M1.17), labelling (M1.18), warranty (M1.19).
Showing 3 of 21 clauses. Full section includes: sub-mains routing (M2.02–M2.03), earthing & bonding (M2.04), circuit schedule (M2.05–M2.06), lighting control (M2.08–M2.10), emergency lighting (M2.11), small power (M2.12–M2.13), data cabling infrastructure (M2.15–M2.17), cable containment (M2.18), labelling (M2.19), testing & commissioning (M2.20), NICEIC certification (M2.21).
| Ref | Title | Discipline | Rev | Date |
|---|---|---|---|---|
| DWG-A-01 | General Arrangement — L4/5/6 GAs, partition layouts, ceiling plans (14 sheets) | Architectural | Rev D | 22 Apr 2026 |
| DWG-A-02 | Joinery & Finishes — meeting suites, tea points, reception (11 sheets) | Architectural | Rev C | 15 Apr 2026 |
| DWG-M-01 | Mechanical Modifications — FCU positions, ductwork, condensate (8 sheets) | M&E | Rev C | 8 May 2026 |
| DWG-M-02 | Electrical & Lighting — power, data, lighting layouts, control zones (7 sheets) | M&E | Rev B | 15 Apr 2026 |
| FFE-01 | FF&E Layout — workstation positions, meeting room sizing, reception (3 sheets) | Tenant | Rev A | 8 Apr 2026 |
| Standard | Title | Applies to |
|---|---|---|
| BS EN ISO 10140 | Acoustics — Laboratory measurement of sound insulation | SPC-A2 partitions |
| BS 8300-1:2018 | Design of accessible buildings — manifestation | SPC-A2 glazing |
| CIBSE LG7 | Lighting for offices | SPC-M2 lighting |
| BS 7671:2018+A2:2022 | Wiring Regulations (18th Edition + Amendment 2) | SPC-M2 electrical |
| Approved Document B | Fire safety (Volume 2 — buildings other than dwellings) | SPC-M3 fire |
| CDM 2015 | Construction (Design and Management) Regulations | All sections |
| BS EN 13501-1 | Fire classification of construction products | SPC-A3 ceilings, SPC-A2 partitions |
| Ref | Sample | Status | Approved | Clause |
|---|---|---|---|---|
| SMP-01 | Joinery oak veneer panel (600 × 400) | Approved | 14 May 2026 | A4.01 |
| SMP-02 | Carpet tile — Milliken Laylines (2 colourways) | Approved | 18 May 2026 | A5.01 |
| SMP-03 | Vinyl flooring — Forbo Sarlon (warm grey) | Approved | 18 May 2026 | A5.06 |
| SMP-04 | Wall paint scheme (5 colours, Dulux Trade) | Approved | 14 May 2026 | A6.01 |
| SMP-05 | Lighting fittings (3 types, 3 zones) | Approved | 21 May 2026 | M2.07 |
| SMP-06 | Door & ironmongery set | Approved | 16 May 2026 | A2.12 |
| SMP-07 | Glazed partition system (Optima) | Approved | 21 May 2026 | A2.06 |
| SMP-08 | Manifestation pattern (frosted gradient) | Approved | 21 May 2026 | A2.08 |
| MU-01 | Meeting suite mock-up — full scale (8 m²) | Approved | 9 Jun 2026 | A2/A4/M2/X1 |
Disclaimer: This specification has been produced by Built AI Ltd using AI-assisted workflow tools applied to the awarded contract documents, tender clarifications, design drawings and design intent captured during the Pre-Con Pack™ Stage 02 (Fine Print™) process. All specification clauses are source-traced to their origin documents. This specification does not replace competent review by qualified designers, engineers and the project team. Final approval of all specification items remains with the Employer, Contract Administrator, Principal Designer and relevant competent persons. Built AI Ltd does not provide structural, fire or M&E engineering design services — all engineering content is derived from and traceable to the appointed design consultants' documents.