PS · Project Specification

Project Specification

148 specification clauses across 11 packages — sourced from contract documents, tender clarifications and design intent. Every clause traceable to its origin.
Project
Northgate Chambers — Floors 4–6 Cat-B Fit-Out
Reference
NG-PS-001 · Revision 1
Prepared by
Built AI Ltd · Pre-Con Office
Issue date
Friday 22 May 2026
Issued to
Cushman Workplace (on behalf of Halberd Properties & Wexley & Crowne LLP)
Status
For Review & Comment
built-ai.io · hello@built-ai.io © 2026 Built AI Ltd BUILT AI
Document Control
RevDateDescriptionPreparedReviewedStatus
Rev 015 May 2026Draft for internal review — 9 of 11 packages completeA. PereiraD. MarchettiInternal Draft
Rev 122 May 2026Issued for client review — all 11 packages, 148 clausesA. PereiraD. MarchettiFor Review
Contract
JCT D&B 2016 with Sectional Completion
Contract Sum
£1,418,650.00 (excl. VAT)
Site
22 Northgate Street, Manchester, M3 2BP
Employer
Halberd Properties Ltd
Tenant
Wexley & Crowne LLP
Contractor
Built AI Ltd (D&B)

Contents

  1. SPC-A1Demolition & Strip-out12 cl.
  2. SPC-A2Internal Partitions & Doors22 cl.
  3. SPC-A3Suspended Ceilings & Acoustics9 cl.
  4. SPC-A4Joinery — Meeting Suites & Tea Points18 cl.
  5. SPC-A5Floor Finishes11 cl.
  6. SPC-A6Wall Finishes8 cl.
  7. SPC-A7L6 Reception & Feature Joinery6 cl.
  8. SPC-M1Mechanical — Supplementary Cooling19 cl.
  9. SPC-M2Electrical, Lighting & Data21 cl.
  10. SPC-M3Fire Detection & Compartmentation14 cl.
  11. SPC-X1Workplace AV8 cl.
  12. APP-ADrawings Referenced
  13. APP-BStandards & Codes Referenced
  14. APP-CSamples & Mock-up Schedule
SPC-A1

Demolition & Strip-out

Source: SPC-A-01 §A10 · Trenholme Architects Rev B
12
Clauses
Strip-out of existing Cat-B fit-out across Floors 4, 5 and 6. Sequenced top-down (L6 first). All existing partitions, suspended ceilings, floor finishes, tea point installations and secondary M&E drops to be removed. Cat-A base-build services and risers to be protected in situ. Licensed waste disposal required.
A1.01 SPC-A-01 §A10.110
General demolition — existing partitions
Remove all existing stud partitions, glazed screens and door sets across L4, L5 and L6. Protect all structural columns, riser walls and compartment-line walls (as identified on DWG-A-01 Rev D). Cut flush to soffit — do not damage structural slab or fire-stopping. All waste to be segregated and disposed of via licensed waste carrier. Asbestos status: R&D survey clear (May 2024); re-inspect if concealed voids are opened.
A1.02 SPC-A-01 §A10.120
Existing ceiling removal
Remove all existing suspended ceiling systems including grid, tiles, hangers and perimeter trims. Retain and protect existing Cat-A fire-rated ceilings to riser and landlord plant areas. M&E services above existing ceiling to be surveyed and photographed prior to ceiling removal. Coordinate with M&E subcontractor to isolate secondary drops before strip-out commences.
A1.03 SPC-A-01 §A10.130
Floor finish removal
Remove all existing carpet tiles, vinyl flooring, transition trims and adhesive residues. Raised access floor panels to be retained where serviceable — panel survey to confirm replacement quantity (estimated 15% replacement rate). Clean and degrease all retained pedestals. New replacement panels per SPC-A5.
A1.07 SPC-A-01 §A10.170
Noise and vibration — adjacent tenant protection
Floors 1–3 remain occupied by existing tenants. All demolition, cutting, drilling and impact works restricted to 10:00 – 16:00 Monday to Friday. Advance tenant notification required 48 hours prior to commencement of noisy works on each floor. Noise monitoring to be installed at L3 ceiling level for duration of strip-out phase. Maximum permissible noise level at L3: 75 dB LAeq,1hr.

Showing 4 of 12 clauses. Full section includes: M&E secondary strip-out (A1.04), tea point removal (A1.05), door & frame removal (A1.06), protection to retained fabric (A1.08), waste segregation & disposal (A1.09), sequencing protocol L6→L5→L4 (A1.10), completion handover per floor (A1.11), photographic record requirement (A1.12).

SPC-A2

Internal Partitions & Doors

Source: SPC-A-01 §K10, §L40 · Trenholme Architects Rev B
22
Clauses
New stud partitions, glazed screens, door sets and ironmongery. Meeting suite walls specified at Rw 42 dB (confirmed per SG-15 closure — legal-sector privacy requirement). Glazed partitions with manifestation per tenant brand approval. Fire-rated glass at compartment line (6 m² Pyrobel 30, per CC-06).
A2.01 SPC-A-01 §K10.110
Stud partitions — open plan to meeting suite
Metal stud partition system: 92mm C-section studs at 600mm centres, twin layers 15mm acoustic-grade plasterboard each side, 75mm mineral wool infill (45 kg/m³ minimum density). Acoustic performance: Rw 42 dB minimum (tested to BS EN ISO 10140). Partition head detail to achieve full-height seal to slab soffit — no air gap. Seal all service penetrations with intumescent mastic.
  • Head track: fixed to soffit via resilient channel (decoupled from structure)
  • Base track: fixed to raised access floor pedestal line, not direct to panel
  • Junction with glazed screen: aluminium framing system per SPC-A2 clause A2.06
A2.06 SPC-A-01 §L40.210
Glazed partition system — meeting suites
System: Aluminium-framed single-glazed partitioning, 12mm toughened laminated acoustic glass. Manufacturer basis: Optima Systems or approved equivalent. Frame finish: anodised aluminium, colour RAL 7016 (anthracite grey). Acoustic: Rw 42 dB (system-tested, not element-tested). Door integration per ironmongery schedule (clause A2.12). Manifestation per clause A2.08.
Design intent cross-reference: DI-02 (meeting suite acoustic privacy) — "a passing colleague cannot hear named-client information." The 42 dB specification directly serves this intent. Sample SMP-07 approved.
A2.08 SPC-A-01 §L40.230 + SG-22
Manifestation — glazed partitions
Manifestation to all full-height glazed partitions per BS 8300-1:2018 (visibility marking for safety). Pattern: frosted gradient (approved per SMP-08 and tenant brand review 21 May 2026). Applied at two bands: 850–1,000mm AFL and 1,400–1,600mm AFL. Density sufficient to provide standing-height visual privacy from corridor. Pattern to be consistent across all three floors per DI-06 (visual continuity).
A2.12 SPC-A-01 §L40.280
Door sets — meeting suites
Door leaf: 44mm solid core, European oak veneer to match feature wall (SPC-A4), factory-finished hard-wax oil matt. Frame: shadow-gap detail, 6mm between door frame and adjacent plaster/joinery — no architrave. Ironmongery: brushed brass lever on rose (Allgood Modric or approved equivalent), magnetic seal system (Lorient IS8010 or equivalent), overhead concealed closer (Dorma ITS 96 or equivalent), privacy indicator (meeting rooms only). Acoustic: Rw 32 dB minimum (door assembly tested). Sample SMP-06 approved 16 May 2026.
Design intent cross-reference: DI-08 (wayfinding — no signage clutter). Meeting suite names etched into brushed brass plate on door frame, no applied plastic signage.
A2.18 CC-06 resolution · Restall fire engineer
Fire-rated glazing — compartment line
6 m² of glazed partition adjacent to the L6 compartment line to be specified as fire-rated (Pyrobel 30), providing 30 minutes integrity and insulation. Frame system to be fire-rated variant of the standard aluminium system (clause A2.06). Fire engineer sign-off received from Restall Fire Consultancy 14 May 2026 (Ref RFC-NG-004). +£4,800 to partition package (per coordination clash CC-06 resolution).

Showing 5 of 22 clauses. Full section includes: partition types schedule (A2.02–A2.05), glazed door sets (A2.07), general-area doors (A2.09–A2.11), ironmongery schedule (A2.13), fire-stopping at partitions (A2.14), junction details (A2.15–A2.17), services coordination zones (A2.19–A2.20), snagging & sign-off protocol (A2.21–A2.22).

SPC-A4

Joinery — Meeting Suites & Tea Points

Source: SPC-A-01 §Z11 · Trenholme Architects Rev C · SMP-01 approved
18
Clauses
Bespoke architectural joinery across all three floors: fluted European oak veneer feature walls to 8 meeting suites, tea point cabinetry with Corian worktops, full-height storage walls, and integrated AV cabling channels. Long-lead item (LL-01) — 10–12 week manufacture. Sample SMP-01 (oak veneer panel) approved 14 May 2026. Mock-up MU-01 signed off 9 June 2026.
A4.01 SPC-A-01 §Z11.110 · SG-01
Meeting suite feature walls — veneer specification
Timber species: European Oak (Quercus robur). Grain match: book-matched (adjacent panels mirrored). Grade: AA — consistent colour, minimal sapwood, no open knots. Fluting profile: 12mm depth at 40mm centres (per SMP-01 approved sample). Finish: hard-wax oil, matt sheen (Osmo Polyx-Oil 3032 or approved equivalent). Panel substrate: 18mm moisture-resistant MDF with high-pressure veneer lamination. Approximate coverage: 96 m² across 8 meeting rooms (L4/5/6).
Design intent cross-reference: DI-05 (material palette — restrained, partner-grade). "No statement colour, no trend material. Should still feel current in 12 years." European oak selected for longevity and timelessness over trend-led alternatives.
A4.04 SPC-A-01 §Z11.140 · CC-04
Integrated AV cabling channels
Every meeting suite feature wall to incorporate internal cable channels: 80 × 50mm minimum clear internal dimensions, positioned behind the oak veneer panel at AV display locations. Low-level lockable access panels (brushed brass, flush with adjacent panel) at every channel termination point. Channels to accommodate: 4× HDMI 2.1 cables, 2× Cat6A data cables, 1× mains power feed. Channel layout per joinery shop drawings (coordinated with AV specialist per CC-04 resolution, 12 May 2026).
Design intent cross-reference: DI-07 (joinery as integrated infrastructure). "No exposed conduit, no surface-mounted screens. Cabling channels designed at spec stage, not retro-fitted on site."
A4.09 SPC-A-01 §Z11.210
Tea point cabinetry
3 tea points (one per floor, consistent specification). Base units: 18mm moisture-resistant MDF carcass, European oak veneer doors to match feature walls (grain-matched within each tea point, not required to match meeting suites). Worktop: Corian (Glacier White or approved equivalent), 20mm solid surface, undermount basin integration, seamless backsplash 150mm. Wall units: open-fronted shelving in oak veneer, integrated LED strip lighting (warm white, 3000K). Appliance provision: utility cut-outs for dishwasher, fridge, instant boiling water tap — tenant-direct supply, contractor to provide services terminations only (per AP-07 closure).
Design intent cross-reference: DI-03 (tea points as collaboration zones). "Booth seating, soft lighting, acoustic ceiling treatment. Visible from open plan but not overheard."

Showing 3 of 18 clauses. Full section includes: full-height storage walls (A4.02–A4.03), joinery door integration (A4.05), shadow-gap junction details (A4.06–A4.08), tea point bin pull details (A4.10), site survey requirements (A4.11), shop drawing protocol (A4.12), factory pre-fit attendance (A4.13), sample & mock-up requirements (A4.14), delivery & install sequencing (A4.15), protection during following trades (A4.16), snagging protocol (A4.17), warranty & maintenance (A4.18).

SPC-M1

Mechanical — Supplementary Cooling

Source: SPC-M-01 §T10, §T31 · Lambourne Vance Engineers Rev B
19
Clauses
Supplementary cooling to augment the landlord Cat-A baseline across all three floors. Fan coil units, ductwork modifications, condensate routing and BMS interface. Subject to landlord sub-main capacity upgrade (R-03 confirmed). FCU positions coordinated with structural beams per CC-01 resolution.
M1.01 SPC-M-01 §T10.110
Fan coil units — type and rating
Manufacturer: Daikin FWF-C series (or approved equivalent). Type: horizontal concealed ceiling-void mounted. Rating: 3.5kW cooling / 4.0kW heating per unit. Quantity: 22 units total (L4: 7, L5: 7, L6: 8 — per revised layout Rev C following CC-01 resolution). Refrigerant: R-32 (low-GWP). Connection to landlord chilled water loop via isolation valves at each floor riser connection point. Controls: integrated BMS interface via BACnet protocol, local thermostat override per zone.
M1.06 SPC-M-01 §T10.160 · CC-01
FCU positions — structural coordination
FCU positions per Lambourne Vance Rev C drawings (issued 8 May 2026), incorporating CC-01 resolution: two L5 FCU positions relocated 600mm north of original design to clear structural beam soffit; one L5 FCU substituted for slim-line equivalent (Daikin FWF-C Slim, 2.8kW). All units to maintain minimum 150mm clearance from structural elements. Access panels per SPC-A3 (acoustic-rated, clause A3.07).
M1.12 SPC-M-01 §T31.120
BMS interface — landlord system integration
All tenant FCUs to be integrated with the landlord's existing Trend IQ4 BMS via BACnet/IP gateway. Gateway to be provided by tenant's M&E subcontractor and installed at each floor's BMS outstation. Monitoring points: supply/return water temperature, fan speed, room temperature, setpoint, occupancy status. Landlord BMS operator to be given read-only access to tenant floor data. Configuration protocol per Halberd Properties BMS access policy (Ref HP-BMS-2024-v3).

Showing 3 of 19 clauses. Full section includes: ductwork modifications (M1.02–M1.05), condensate routing (M1.07–M1.08), pipe insulation (M1.09), valve schedule (M1.10–M1.11), commissioning requirements (M1.13–M1.15), balancing (M1.16), O&M documentation (M1.17), labelling (M1.18), warranty (M1.19).

SPC-M2

Electrical, Lighting & Data

Source: SPC-M-01 §T31, §T32 · Lambourne Vance Engineers Rev B
21
Clauses
Sub-mains and floor distribution (switchgear LL-03), lighting (suspended linear to open plan, recessed to tea points, feature pendant to client-facing zones — per lighting decision 21 May), small power, Cat6A data cabling, floor box layouts, lighting control zoning and BMS interface.
M2.01 SPC-M-01 §T31.110
Sub-mains & floor distribution boards
Floor distribution: 800A MCCB panel per floor, fed from landlord's sub-main riser (capacity upgrade confirmed by Halberd Properties, letter of comfort 18 Apr 2026). Each floor panel to incorporate: main incoming isolator, CT metering (landlord check-meter), RCBO protection per final circuit. Switchgear manufacturer: Schneider Electric Prisma P (or approved equivalent). Long-lead item LL-03 — 9–10 week delivery. Order via Edmundson Electrical (Marlow nominated wholesaler).
M2.07 SPC-M-01 §T32.170 · SG-09
Lighting fittings — zone strategy
Three lighting zones with distinct fitting types (per lighting decision meeting 21 May, SG-09 closure):
  • Open plan: Suspended linear LED (Whitecroft Mantis III or equivalent), 4000K, UGR <19, direct/indirect ratio 40/60. Aligned to 1200 × 600 ceiling grid.
  • Tea points & collaboration zones: Recessed circular LED downlight (Whitecroft Mino or equivalent), 3000K warm white, dimmable via DALI.
  • Client-facing meeting rooms & reception: Feature pendant (Bocci 28 series or equivalent), 2700K, decorative complement to oak veneer. Quantity per room per lighting layout DWG-M-02 Rev B.
Design intent cross-reference: DI-04 (workstation lighting — comfort over compliance). "Lighting must support 8-hour reading without eye strain — direct/indirect mix, low UGR, daylight integration via L4 perimeter."
M2.14 SPC-M-01 §T32.340 · CC-03
Floor boxes — power & data
Floor boxes at workstation positions per tenant FF&E layout (Cushman Rev A). Product: slim 130mm floor box (selected per CC-03 resolution — existing raised floor cavity depth 150mm precludes standard 200mm product). Each box: 2× twin 13A switched sockets, 2× Cat6A RJ45 data outlets. Quantity: 48 floor boxes total (L4: 16, L5: 16, L6: 16). Floor box lid: brushed stainless steel, flush with carpet tile finish.

Showing 3 of 21 clauses. Full section includes: sub-mains routing (M2.02–M2.03), earthing & bonding (M2.04), circuit schedule (M2.05–M2.06), lighting control (M2.08–M2.10), emergency lighting (M2.11), small power (M2.12–M2.13), data cabling infrastructure (M2.15–M2.17), cable containment (M2.18), labelling (M2.19), testing & commissioning (M2.20), NICEIC certification (M2.21).

SPC-A3 · A5 · A6 · A7 · M3 · X1

Remaining Specification Sections

6 additional packages · 76 clauses total
76
Clauses
The following six packages are fully specified in the complete document (NG-PS-001 Rev 1). Summary scope and clause counts shown below. Each clause follows the same structure: clause ID, source reference, title, specification text, design intent cross-references and sample approvals where applicable.
SPC-A39 clauses
Suspended Ceilings & Acoustics
Acoustic tile ceiling (1200 × 600 plank, Class A absorption), exposed soffit treatment in collaboration zones, FCU access panels (acoustic-rated Knauf Aquapanel — per CC-05 resolution). Integration with lighting and M&E services above.
SPC-A511 clauses
Floor Finishes
Carpet tile (Milliken Laylines, confirmed per SG-04 closure 18 May), vinyl to tea points (Forbo Sarlon), raised access floor replacement panels (15% estimated). Transition details, underlay, subfloor preparation.
SPC-A68 clauses
Wall Finishes
Paint scheme (Dulux Trade matt, 5-colour palette per SMP-04 approved 14 May), vinyl wall covering to tea points (washable), feature wall finishes in client-facing areas. Manifestation per branding decision.
SPC-A76 clauses
L6 Reception & Feature Joinery
Reception desk, branded feature wall, low-level seating. Provisional sum item (£24k). Design intent confirmed Wk 5 (DI-09). Specification locked 16 Jun. Enquiry issued Wk 9. Order target Wk 10.
SPC-M314 clauses
Fire Detection & Compartmentation
Cat-B alterations to fire detection loop (addressable system, integration with landlord main panel), compartmentation at new partition lines, fire-stopping, smoke ventilation rebalancing. Restall Fire Consultancy sign-off required.
SPC-X18 clauses
Workplace AV
14× displays (55" commercial, Samsung QB55R or equivalent), 6× video bars (Poly Studio X50), ceiling microphones (Shure MXA920), control system (Crestron Flex). Provisional sum (£40k → ordered £38,400). RFI NG-014 closed 27 May.

Appendix A — Drawings Referenced

RefTitleDisciplineRevDate
DWG-A-01General Arrangement — L4/5/6 GAs, partition layouts, ceiling plans (14 sheets)ArchitecturalRev D22 Apr 2026
DWG-A-02Joinery & Finishes — meeting suites, tea points, reception (11 sheets)ArchitecturalRev C15 Apr 2026
DWG-M-01Mechanical Modifications — FCU positions, ductwork, condensate (8 sheets)M&ERev C8 May 2026
DWG-M-02Electrical & Lighting — power, data, lighting layouts, control zones (7 sheets)M&ERev B15 Apr 2026
FFE-01FF&E Layout — workstation positions, meeting room sizing, reception (3 sheets)TenantRev A8 Apr 2026

Appendix B — Standards & Codes Referenced

StandardTitleApplies to
BS EN ISO 10140Acoustics — Laboratory measurement of sound insulationSPC-A2 partitions
BS 8300-1:2018Design of accessible buildings — manifestationSPC-A2 glazing
CIBSE LG7Lighting for officesSPC-M2 lighting
BS 7671:2018+A2:2022Wiring Regulations (18th Edition + Amendment 2)SPC-M2 electrical
Approved Document BFire safety (Volume 2 — buildings other than dwellings)SPC-M3 fire
CDM 2015Construction (Design and Management) RegulationsAll sections
BS EN 13501-1Fire classification of construction productsSPC-A3 ceilings, SPC-A2 partitions

Appendix C — Samples & Mock-up Register

RefSampleStatusApprovedClause
SMP-01Joinery oak veneer panel (600 × 400)Approved14 May 2026A4.01
SMP-02Carpet tile — Milliken Laylines (2 colourways)Approved18 May 2026A5.01
SMP-03Vinyl flooring — Forbo Sarlon (warm grey)Approved18 May 2026A5.06
SMP-04Wall paint scheme (5 colours, Dulux Trade)Approved14 May 2026A6.01
SMP-05Lighting fittings (3 types, 3 zones)Approved21 May 2026M2.07
SMP-06Door & ironmongery setApproved16 May 2026A2.12
SMP-07Glazed partition system (Optima)Approved21 May 2026A2.06
SMP-08Manifestation pattern (frosted gradient)Approved21 May 2026A2.08
MU-01Meeting suite mock-up — full scale (8 m²)Approved9 Jun 2026A2/A4/M2/X1

Disclaimer: This specification has been produced by Built AI Ltd using AI-assisted workflow tools applied to the awarded contract documents, tender clarifications, design drawings and design intent captured during the Pre-Con Pack™ Stage 02 (Fine Print™) process. All specification clauses are source-traced to their origin documents. This specification does not replace competent review by qualified designers, engineers and the project team. Final approval of all specification items remains with the Employer, Contract Administrator, Principal Designer and relevant competent persons. Built AI Ltd does not provide structural, fire or M&E engineering design services — all engineering content is derived from and traceable to the appointed design consultants' documents.

BuiltAI
PROJECT SPECIFICATION — COMPLETE

148 clauses. 11 packages. One source of truth.

Every specification clause in this document traces back to its source — an outline NBS clause, a CIBSE standard, a tender clarification, a design intent capture, or a coordination clash resolution. Nothing is invented. Nothing is assumed. Every material, every performance standard, every interface boundary is documented, sample-approved where applicable, and ready for the supply chain.
SPEC CLAUSES
148
PACKAGES
11
SAMPLES APPROVED
9
DI CROSS-REFS
12
built-ai.io · The Pre-Con Pack™ · PS · Project Specification © 2026 Built AI Ltd · NG-PS-001 Rev 1