RAMS Factory
RAMS Factory™Pack 03 / 06 · Client deliverable
Emergency arrangements · confined space sewer entry

The rescue plan comes before the entry

Emergency contacts, rescue plan, fire procedure, first aid, spill response and escalation for confined space sewer works in a city centre. The confined space rescue plan is the cornerstone: every entrant understands it before any entry is authorised, and the top-man never enters the chamber under any circumstances.

Client
Cambridge Sewerage
Site
Mill Road and Hooper Street · CB1 2AS
Work type
Confined space, sewer chamber entry
Reference
BAI-EMR-AWS-CSP-001
Sector
Utilities
Status
Drills booked

Illustrative example: fictional project and parties.

12Emergency contacts on the plan
5Procedure scenarios
1Critical scenario, confined space rescue
2First aiders on every shift
BuiltAI Intelligence Ltd · built-ai.ioBAI-EMR-AWS-CSP-001 · Rev 01
01Entry gates

Nothing enters until the gates are set

The works are phased sewer-chamber entries, each cycle held to a maximum of thirty minutes, over an eight-week programme. Before any confined space entry is authorised, the site supervisor will not sign the permit unless six things are in place: a completed rescue drill with the water authority's rescue team, calibrated atmospheric monitoring, current tripod, winch and harness inspection, a proven communication test, a dedicated top-man stationed at the entry, and the specialist rescue teams pre-briefed for the shift.

Confined space rescue is critical

The rescue plan is non-negotiable and briefed to every entrant. The full mock retrieval at the live entry point with the water authority's rescue team is booked for Monday 11 May, and no entry is authorised until it is complete and signed off.

02Contacts & rescue

Contacts and the retrieval sequence

Twelve contacts are held on the plan. The public emergency numbers below sit alongside named site roles and the pre-arranged specialist rescue team.

Role or serviceAvailability
BuiltAI site supervisor and confined space top-manOn site and at entry
Water authority confined space rescueOn call, pre-arranged
Fire and Rescue hazardous area response, 999 or 11224 hours
Nearest A and E, Addenbrooke's, 4.2 miles24 hours
Environment Agency pollution hotline, 0800 80 70 6024 hours
NHS 111 and Police non-emergency 10124 hours

The retrieval sequence, drilled with the water authority rescue team and briefed to every entrant. No one enters the chamber to attempt a rescue.

StepAction
01 Top-man identifies and activates rescueDistress, alarm or no response on comms. Radios the rescue team, sounds the siren, notifies the supervisor. Does not enter
02 Controlled mechanical retrievalCasualty on harness with tripod and winch attached. Top-man winches from outside; no one enters the chamber
03 Supervisor takes incident commandCalls 999 or 112 for the hazardous area response team, notifies the water authority rescue, coordinates at the entry
04 Casualty assessment and specialist handoverFirst aider assesses above ground; the pre-briefed rescue teams take over the worksite on arrival
03Escalation

Scenarios and escalation

Five scenarios are covered: confined space rescue, fire, first aid, spill and pollution, and the communication and escalation protocol. Radio is the primary on-site channel with phone as back-up. The escalation matrix routes by severity: a life-threatening event goes to 999 plus the project manager, the water authority and a BuiltAI director within five minutes; a lost-time injury or major spill to the project manager and water authority within thirty minutes; a minor injury or near miss to the daily report within 24 hours.

Drills

The full rescue drill is Monday 11 May with the water authority rescue team, running an unconscious-casualty, atmospheric-alarm and communication-failure scenario. A fortnightly refresher follows, with a full physical drill repeated at week 5.

04Assembly

Assembly, roll call and after the incident

Once anyone is clear of the chamber, the response moves to accounting for people and handing the scene to the responders. Nobody re-enters until the cause is made safe and the supervisor gives the all-clear.

StepArrangement
Muster pointAgreed point clear of the chambers, plant and the traffic route
Roll callSupervisor counts every signed-in operative and visitor against the entry log
Person unaccountedNo one re-enters; the rescue team accounts for anyone missing
Access for respondersGate and route kept clear, a marshal directs 999 vehicles to the entry
Casualty handoverName, time and mechanism recorded and passed to the ambulance crew
Scene preservedArea left undisturbed for investigation once casualties are safe
All-clear to returnOnly the supervisor authorises return, after the cause is made safe
Rescue drill before first entryRequired
Refresher cadenceFortnightly
Full physical re-drillWeek 5
Reported, then reviewed

A reportable event is notified under RIDDOR within the statutory window, and the escalation routes for a life-threatening event, a lost-time injury or a major spill run in parallel. Every incident and near miss is logged the same day and reviewed, and the arrangements are revised before entries resume if the review calls for it.

Reference BAI-EMR-AWS-CSP-001Basis Confined space entry, permit-controlledRevision 01