Evidence pack · heritage roof restoration

No handover until the pack is closed

What evidence has to be captured during the works and retained for the project record: the standard for photographs, briefings, inspections, certificates and sign-offs. On this Grade II listed chapel the pack overlays the standard requirements with the heritage protocol agreed with the Conservation Officer. Thirty-two of forty items are captured; eight remain, and the handover is gated on their closure.

Client
St Magdalene's Chapel
Site
Magdalene Lane, Salisbury · SP1 2HE
Work type
Heritage roof and lead flashing, Grade II
Reference
BAI-EVD-SMC-HER-001
Sector
Heritage
Status
In progress

Illustrative example: fictional project and parties.

40Evidence items across six categories
32Captured to date, 80 percent
8Outstanding before handover
6Categories, from photos to sign-offs
BuiltAI Intelligence Ltd · built-ai.ioBAI-EVD-SMC-HER-001 · Rev 01
01Heritage overlay

Standard record, plus the heritage protocol

This is a Grade II listed building, so the evidence pack overlays the standard RAMS requirements with the protocol agreed with the Conservation Officer at the pre-start meeting. Heritage-specific items, from baseline elevation photography to the bound record of works, are captured and retained for the chapel archive even where they are not strictly required for RAMS purposes. No item is closed until the Conservation Officer has acknowledged receipt.

Where the pack stands

Thirty-two of forty items are captured and verified. The list is generated from the project type, the RAMS scope and the pre-start agreement, and the competent person retains responsibility for capture, retention and final handover of every item.

02Categories

Progress by category

Six categories, each tracked as captured against required. Briefings and certificates are complete; sign-offs and inspections carry the bulk of what remains.

Photographic record6 of 8
Permits and authorisations6 of 7
Briefings and training6 of 6
Inspections and test records4 of 6
Certificates and compliance7 of 7
Sign-offs and handover3 of 6
03Outstanding

Eight items, action before handover

Each outstanding item must be captured, retained and acknowledged by its owner before the final handover certificate can be issued. The outstanding items are concentrated in a small set of dependencies: the lead-worker health-surveillance results from occupational health, the curated final photo set for the Conservation Officer, the joint completion inspection, the snagging closure from the phase 2 sign-off, the bound heritage record of works, and the handover certificate that is gated by all of them.

Handover gate

The final handover certificate is issued only when the pack is closed and the Conservation Officer has accepted the heritage record. Until then the pack status stays in progress.

Reference BAI-EVD-SMC-HER-001RAMS BAI-RAMS-SMC-HER-001Revision 01, in progress