Job intake · site context and high-risk triggers

No RAMS is drafted until the intake is signed

The intake captures the brief, the site, the live-environment risks, the permits, the isolations and the high-risk triggers before a single method statement is written. It gates the whole production run. On this job the trigger review returns a conditional start: an asbestos survey and a roof-load check must close before any RAMS is issued.

Client
Exchange House Roofing
Site
Kings Road, Reading · RG1 2AB
Work type
Reactive FM, emergency roof make-safe
Reference
BAI-JIF-EXH-ROOF-001
Sector
Commercial
Status
Ready, conditional

Illustrative example: fictional project and parties.

~120 m²Storm-damaged flat roof, pre-2000 felt
4High-risk triggers rated required
12Permit lines reviewed at intake
3-4Days on site, weather dependent
BuiltAI Intelligence Ltd · built-ai.ioBAI-JIF-EXH-ROOF-001 · Rev 01
01Purpose

Agree the job before anyone drafts a method

Emergency temporary waterproofing to roughly 120 m² of storm-damaged flat roof at Exchange House, a fully occupied seven-storey office, with make-safe to the two floors below. Reactive works like this are where corners get cut, so the intake is deliberately the first gate: it fixes the brief, the access, the live-environment risks and the high-risk triggers before drafting begins. A method statement written ahead of a signed intake is a method statement written blind.

Why it comes first

The intake is completed with AI-assisted structured capture and confirmed by a competent person. It sets the RAMS reference to follow, BAI-RAMS-EXH-ROOF-001, and it hands the drafting team a fixed set of facts, triggers and permits rather than a blank page.

02Site & scope

The facts the RAMS is built on

Captured at intake and held as the fixed basis for drafting. Any change on site is reflected in a revised intake before the RAMS is reissued.

ItemCaptured position
BuildingSeven-storey office, fully occupied, shared tenanted
Work areaFlat roof, north-west corner, approx. 120 m², pre-2000 bituminous felt
Primary scopeCold-applied temporary waterproofing overlay following storm damage
Make-safe scopeCeiling inspection and drip containment to floors 5 and 6
Working hours07:30 to 16:30, Monday to Friday, roof access after 08:30
Duration3 to 4 days, reactive and weather dependent
Access and liftingInternal stairwell for operatives, mechanical hoist to roof via rear courtyard
Adverse weatherSuspend rooftop works if sustained wind reaches 16 m/s

Applicable standards captured at intake: CDM 2015, PASMA and IPAF for work at height, HSE roofing guidance and BS 8000-4.

03Triggers

High-risk trigger review

Twelve triggers were screened: four required, four advisory and four clear or not applicable. The eight rows below are an extract (four required, two advisory, one clear and one not applicable); the other four screened entries are not identified in this table. Every required and advisory trigger carries through into the risk assessment.

TriggerBasisOutcome
Work at heightRooftop works at seven-storey parapet levelRequired
Lifting operationsMechanical hoist to roof, lift plan and exclusion zoneRequired
Live occupied environmentBuilding occupied throughout, segregation and access controlRequired
Specialist competencyWAH-trained operatives, PASMA or IPAF, hoist operatorRequired
AsbestosPre-2000 felt, survey required before disturbanceAdvisory
Structural loadingRoof load to be confirmed against hoist and material weightsAdvisory
Hot worksCold-applied overlay specified, no torch workClear
Gas and confined spaceNot applicable to this scopeNot applicable
Critical flag

The pre-2000 bituminous felt is treated as an asbestos risk until proven clear. A refurbishment and demolition survey must be completed and the felt confirmed clear before any disturbance. Works do not proceed on the roof covering without it.

04Permits & readiness

Permits, COSHH and the go decision

Of the twelve permit lines reviewed, five are confirmed required for this scope, two carry a flag pending survey, and five are not applicable. The confirmed set covers the work-at-height permit, daily roof-access authorisation, the lifting permit for the hoist, the building induction and the site-rules briefing. COSHH is limited to the cold-applied membrane and its primer, both needing safety data sheets before mobilisation and both routed to the COSHH Index.

Permit lines confirmed required5 of 12
Flagged pending the survey2 of 12
High-risk triggers required4 of 12
Ready to proceed

Conditional. The intake is complete and signed, but two items gate the RAMS: the asbestos survey on the felt, and the structural load check for the hoist and materials. Both must close before the method statement and risk assessment are issued.

Reference BAI-JIF-EXH-ROOF-001RAMS to follow BAI-RAMS-EXH-ROOF-001Status Ready, conditional