Skip to main content
Bidroom in a Box

Worked example · BAI-BIAB

One sample tender, taken from pack to submission.

Bidroom in a Box

A fictional mechanical and electrical sub-contract, worked through all five stages. Ten sample documents: five client-facing deliverables and five internal working documents. Read them in the browser or download their PDFs.

Follow the WorkOpen the deliverables

Worked exampleThese documents use fictional projects and figures. Open the originals to inspect their source context.

Working stages
05
Deliverables
05

Bidroom in a BoxEvidence explorer

One question. Still visible at the next step.

Follow the liquidated-damages question from the clarification register into the tender letter, then inspect who checks the work before issue.

B99 Malthouse Block · ITT KW-2026-4471. Fictional project and parties. Source excerpts from saved specimens, not a live AI run, customer result or recorded approval by you. The original tender instructions are not reproduced here.

01 / Source record

Record the unanswered point.

RFI-12 is parked in the Question Time register. The rate remains to be agreed; the working position is stated rather than silently treated as a fact.

B99-QT-03 · Stage 03 · register closed for review 14 May 2026. This is the existing working register, not the original client ITT.

Read the clarification register (new tab)
Bidroom in a BoxSource excerpt

Clarifications and RFI register

RFI-12 · parked
Liquidated damages rate. The per-day figure is to be agreed pre-contract; BuiltAI prices to a stated working assumption and reserves the right to revisit.
Working assumption priced to
Liquidated damages at a stated working rate, revisited pre-contract
Verbatim RFI-12 excerpt from Question Time. Parked does not mean answered.

02 / Prepared output

Carry the position into the tender.

The tender letter carries the same unresolved commercial point as an explicit clarification. Preparing the output has not turned an assumption into an agreed contractual term.

B99-TLP · Rev 1 · clarification in the scope, assumptions and exclusions table. Open the complete specimen to see its context.

Inspect the complete tender letter (new tab)
Bidroom in a BoxSource excerpt

Tender letter and proposal

Clarification · liquidated damages
Liquidated damages: rate to be agreed pre-contract; priced to a working assumption
Verbatim clarification from the published tender letter and proposal, revision 1.

03 / Human review

Keep responsibility with your team.

Last Look assigns different checks to the roles that own them. These selected responsibilities explain the review boundary; choosing this view cannot approve or issue the tender.

B99-LL-05 · Stage 05 · gate reviewed 15 May 2026. Three of the six roles in the fictional record. The complete document contains the remaining roles and checklist.

Read the complete review record (new tab)
Bidroom in a BoxSource excerpt

Who checks what

Technical Lead
Scope and the contractor's design portion
Commercial Manager
Pricing, markup suppression and terms
Bid PM
Submission authorisation ahead of the deadline
Selected verbatim responsibilities from Last Look. Not an operational approval panel.

01 / follow the working record

What each stage produced

The working documents behind the five stages, in the order they were made. These stay inside your team; the client set below is what goes out.

Read each document in your browser. Where a PDF exists, it is linked beside it.

See the deliverables

02 / inspect the output

What the client receives

Five client-facing documents from the sample tender. Open each original to inspect the detail, or download its PDF companion.

Inside the example

Client summary

A complete first-page preview. Open the original to inspect all 3 pages at full size.

Inspect Original: Client summary
Complete first page of the example Client summary
01 / 03 pages Original document

About these examplesThe project, client and figures in these documents are a sample built for the worked example, not a client record. The format, structure and governance are what the pack produces.

Before anything is issuedThe examples show the format and structure. Your competent people review, validate and approve the work before it is issued.

Put BuiltAI to work

Now run it on yours.

Bring a real piece of work. Explore what a structured workflow could give back to your team.